Value Engineering of mechanical and electrical system of the Lumiere (park land) which is a residential project consists of two towers PL52 and PL53 with some commercial areas and shop houses with estimated savings of 24 Billion VND.
MASTERISE CENTRE POINT
Value Engineering services of mechanical and electrical system of the Masterise Central park 50 Billion VND.
SUN TOWER
Value engineering of the mechanical and electrical system of Sun Tower which is a grade A office building, the estimated savings 24 Billion VND.
ONE CENTRAL TOWER
Mixed use building consist of hotel, office, commercial and residential parts.
Mel engineering provided review of the mechanical and Electrical system with estimated savings value of 75 Billion VND.
OCEAN PARK
Residential complex Scope of Service: Value Engineering of Mechanical and electrical systems Amount saved: 11 Billion VND Date: October 2021
AMAN NAI LERT HOTEL AND RESIDENCES BANGKOK
A 30 floors Hotel and luxuries residence building located in Bangkok Thailand with an approximate GFA of 35,000 m2
MEL Engineering scope was reviewing the design ana provide Value engineering services.
MAHANAKHON TOWER
Mixed-use High rise building (315 m) that contain hotel part and serviced apartment part. The total GFA around 270,000 m2
(Note: this project was performed while working with the previous company)
Scope of Service:
Value Engineering of Mechanical and electrical systems
Amount saved
7,000,000 US$
Main VE Items:
Changing the cooling system from DX to chilled water system
Reducing the oversized cooling capacity by 40%
Reducing the electrical load by 25%
Reducing number of domestic pumps
Centralizing the apartment exhaust
Date: July 2012
Landmark Waterfront – Bangkok
Mixed-use High rise development, consist of two hotels four seasons and capella in addition to Foour seasons residences tower The total GFA around 280,000 m2
(Note: this project was performed while working with the previous company)
Scope of Service:
Value Engineering of Mechanical and electrical systems
Amount saved
7,075,000 US$
Main VE Items:
Reducing the cooling capacity by 60%
Reducing number of chillers from 11 to 3
Reducing cooling tower from 11 to 3
Reducing cooling pumps from 39 to 10
Reducing 20% of the FCU
Reduce the electrical load by 34% and thus reduction in transformers and generators
Date: July 2015
Capital Place (Four Seasons Hotel) - Jakarta
Mixed-use Highrise development, Hotel and residence. The total GFA around 206,000 m2
(Note: this project was performed while working with the previous company)
Scope of Service:
Value Engineering of Mechanical and electrical systems